85A Wildey Street, Raceview
21 lot residential subdivision delivered for the developer: earthworks, stormwater, sewer, watermain, retaining walls, bio-basin and roadworks.
Read the case studyHome / Projects
Subdivisions, trunk sewers, stormwater, watermains and road upgrades for developers, councils, utilities and Tier 1 and Tier 2 contractors.
We work directly for developers and as a civil subcontractor to Tier 1 and Tier 2 contractors, councils and utilities.
21 lot residential subdivision delivered for the developer: earthworks, stormwater, sewer, watermain, retaining walls, bio-basin and roadworks.
Read the case studyNew sewer reticulation main up Parkhead Street and a new sewer structure over the DN500 trunk main at East Owen and Parkhead Streets, plus a stormwater RCBC road crossing and outlet headwall. Installed under the Santos oil pipeline, working with Santos.
Installation of sewer and stormwater infrastructure: 1,500 lm of pipework and 32 sewer and stormwater structures.
700 lm leachate rising main and associated pump station structure, plus an adjacent 750 lm underground electrical conduit bank and electrical pits.
Earthworks, stormwater, structures and pavements.
Earthworks, stormwater, structures and pavement to TMR specification on the Bruce Highway upgrade north of Rockhampton.
2 km of 500–630 mm trunk sewer main and associated structures, including a crossing of the Santos pipeline at Swanbank Road.
1.2 km road upgrade and 1.8 km of 450 mm trunk watermain installation.
Dual upgrade of Settlement Road including stormwater, sewer, watermain and roadworks.
External road upgrade for an industrial development, including stormwater, water, sewer, all concrete works and roadworks.














Send us your drawings and we'll come back with a fixed scope and price.