Sewer Infrastructure Contractor

Sewer reticulation, trunk sewers and rising mains with the structures and live connections that go with them, for developers, councils and utilities.

Sewerage infrastructure across South East Queensland

From property connections on a residential subdivision to 500 to 630 mm trunk sewer mains, we lay gravity and pressure sewer in deep, battered and shored trenches, build cast-in-situ and PE lined maintenance holes, and connect to live networks under the utility's permits.

We have worked to Urban Utilities and Logan Water requirements, including crossings of the Santos high pressure pipeline, and we close out with the testing, CCTV and as-constructed data the utility needs to accept the assets.

What's included

  • Sewer reticulation and property connections
  • Trunk sewer mains
  • Rising mains and pump station structures
  • Cast-in-situ and PE lined maintenance holes
  • Live connections to existing networks
  • Deep and shored excavation
  • Pipeline and service crossings
  • Testing, CCTV and ADAC data

Part of a subdivision?

As a subdivision civil contractor we can deliver sewerage infrastructure on its own or as part of the full civil package, under one contract through to on-maintenance. See how we deliver subdivisions.

Related projects

A selection of sewerage infrastructure work by Genesis Civil.

Swanbank Sewer Augmentation

with Downer for Urban Utilities

2 km of 500–630 mm trunk sewer main and associated structures, including a crossing of the Santos pipeline at Swanbank Road.

Trunk sewerStructuresPipeline crossing

23 East Owen Street, Raceview

for Bentancorp

New sewer reticulation main up Parkhead Street and a new sewer structure over the DN500 trunk main at East Owen and Parkhead Streets, plus a stormwater RCBC road crossing and outlet headwall. Installed under the Santos oil pipeline, working with Santos.

SewerStormwater RCBCPipeline crossing

Caboolture Waste Facility

with Winslow for Moreton Bay Regional Council

700 lm leachate rising main and associated pump station structure, plus an adjacent 750 lm underground electrical conduit bank and electrical pits.

Rising mainPump stationConduits

Yarrabilba Precinct 6

with Goldings, Stockland residential subdivision

Installation of sewer and stormwater infrastructure: 1,500 lm of pipework and 32 sewer and stormwater structures.

SubdivisionSewerStormwater